1 Selection of construction with the help of a general contractor, real estate agent, architect or engineer. Careful planning should ensure to build the new garage and the size of the construction project to suit your needs exactly.
2 His team of architects develops the construction of new garage plans to meet state and local laws pending inspector local needs. The plans are an alternative online garages, which are also an excellent start to plan the construction of a new garage.
3 If you decide to work with an architect to review with you the plans and programs for the new building.
4 The architect or building contractor shall apply to parking permits.
5 teams of excavation is used to cleanse the earth.
6 The general contractor or engineer will present the new location of the building garage.
7 heavy machinery to dig the foundations of the building.
8 of the builder or general contractor pour the foundations.
9 The walls are made or block walls are built mason.
10 The new excavator is filled around the foundation.
11 The external walls and interior walls are framed optional.
12 The Bridge on the roof is framed and applied to the walls and ceiling. The edges of the roof rakes can be complemented by decorative panels at this time.
13 The building inspector shall inspect any construction of the sentence. Note: Check with your local office to check on inspection, may also be the design and inspections equal footing with the other requirements of the Code.
14 Roofing: drip edge, the guard of ice, tar paper and tiles are attached with ventilation installed applications.
15 Windows and doors: Carpenters now install the level of lead window and took on the diagonal. The exterior doors were installed now, even if the large garage doors are installed in the project to avoid damage.
16 coating. Your builder or sider now install coatings applied to foam board insulation and Tyvek exterior house wrap or equivalent. Vinyl, aluminum coatings and coatings cedar are popular options.
17 Optional: plumbing, HVAC (heating, cooling, ventilation and air conditioning) is installed.
18 Electrical work: The electrician installs the electricity first.
19 Optional: Install insulation Interior
20 Optional: Your contractor or sub contractor to install drywall and drywall finishes
21 Optional: Installation of cabinet shelves and the opportunity to build on the work benches
22 Optional: finish plumbing electrical and HVAC work.
23 Optional: motherboard and the installation window adjustment
Final 24 garden with lawn, trees, shrubs and complete the exterior complement and complete the construction of the new box.
Note: Before building the new garage be sure to determine the best garage floor very size of the building, if necessary.